- Playground Renovations
-
PLAYGROUND RENOVATIONS
Center Grove will renovate the playgrounds of all five elementary schools during the summer/fall of 2018.
Existing playgrounds will be removed and new equipment and a rubberized surface will be installed. Depending on the weather, the work should be complete before the start of school.During these renovations, the playgrounds will be closed to the public.
The cost of the renovations will be paid from remaining funds from the Walnut Grove Elementary project. Bids for that project came in under budget, which allowed the Board to complete other needed projects. Due to the age and condition of the existing equipment and the method used to remove it, there is a liability for the school corporation to donate this equipment. Every piece of equipment was inspected by our certified playground inspector along with the manufacturer to determine the condition prior to laying out the new playgrounds.
CENTER GROVE ELEMENTARY
TIMELINE (ESTIMATED)
- June 4-13: Equipment removal, site work, installation of new equipment, concrete curbs
- June 11-20: Sub-base and poured in place
- Around June 18: New Playworld equipment to be installed
RENDERINGS
- Click here to view renderings of the new CGES playgrounds.
- Center Grove Elementary has one new piece of equipment that will remain and another piece of equipment that had already been purchased, which will be added to their playground.
MAPLE GROVE ELEMENTARY
TIMELINE (ESTIMATED)
- July 9-18: Equipment removal, site work, installation of new equipment, concrete curbs
- July 13-23: Sub-base and poured in place
- After July 21: New Playworld equipment to be installed
RENDERINGS
- Click here to view rendererings of the new MGES playgrounds.
NORTH GROVE ELEMENTARY
TIMELINE (ESTIMATED)
- June 14-23: Equipment removal, site work, installation of new equipment, concrete curbs
- June 21-30: Sub-base and poured in place
- After June 28: New Playworld equipment to be installed
RENDERINGS
- Click here to view renderings of the new NGES playgrounds.
PLEASANT GROVE ELEMENTARY
TIMELINE (ESTIMATED)
- June 25-July 7: Equipment removal, site work, installation of new equipment, concrete curbs
- July 2-12: Sub-base and poured in place
- After July 10: New Playworld equipment to be installed
RENDERINGS
- Click here to view renderings of the new PGES playgrounds.
SUGAR GROVE ELEMENTARY
TIMELINE (ESTIMATED)
- July 19-28: Equipment removal, site work, installation of new equipment, concrete curbs
- July 24-31: Sub-base and poured in place
- After July 29: New Playworld equipment to be installed
Note: Sugar Grove will be the final project so as to not interfere with the Strawberry Festival in early June.
RENDERINGS
- Click here to view renderings of the new SGES playgrounds.